Building Projects
Musselburgh Racecourse
Client: East Lothian Council
Value: £3.3M
Contract: Scottish Building Contract with quantities
Contract Period: 36 weeks
Architect: East Lothian Council
Engineer: Wardell Armstrong
Surveyor: Gleeds
Please click on a thumbnail to view
Project Description:
Redevelopment of Racecourse facilities.
Works Included:
- Construction of new building, housing restaurant/locker room/shower & changing rooms.
- Stone column piling, steel frame with fibre cement profiled sheet roof, precast concrete first floor.
- Glazed front & rear elevations with facing brick gables.
- Facing brick partition walls, suspended ceilings, timber, ceramic tile & vinyl floor finishes.
- Installation of steel stair and glass walled platform lift.
- Plumbing, heating, ventilation, air conditioning & electrical services.
- Construction of 105 stables, horse shower bays, vet & VBT rooms. The perimeter stables link with the jockey welfare building to form a secure stable yard.
- Stone column piling, concrete slab, steel frame with fibre cement profiled sheet roof & hardwood timber planking walls.
- Plumbing & electrical services.
- Construction of groundsman store, mess & locker rooms plus Outdoor Activities Centre with offices, canteen, changing & shower facilities.
- Stone column piling, concrete slab, steel frame with fibre cement profiled sheet roof & upper walls, precast concrete wall panels.
- Roller shutters, glazed walling & doors.
- Timber partitions & joisted first floors, timber doors, ceramic tile & vinyl floor finishes.
- Decoration.
- Plumbing, heating, ventilation, solar panels & electrical services
- Construction of BMX track to “Regional” standard
- External mains services, roads & car parks