100,000ft² Warehouse

Client: Forth Ports Ltd

Contract: NEC 3 Option A

Project Description:

Design and Build of a 100,000ft² Storage Facility

Works Included:

  • Excavations
  • Sub base formations (20,000T Subbase)
  • Drainage (2000m)
  • Piling (276 No 250 Sq concrete piles)
  • Concrete foundations 450m³
  • Concrete flooring (1700m³/ 9400m²)
  • Kerbing 900m
  • External concrete hardstandings (1600m³)
  • Structural steelwork (340T)
  • Cladding
  • Mechanical and electrical
  • Roller shutter doors (8No)
  • Doors (17No)
  • Fencing and gates (350m/2 No)
  • Windows (7No)
  • Suspended ceilings
  • Decorations