Client: Albert Bartlett
Value: £328k
Contract: SBCC Conditions of Contract (SBC/Q/Scot) 2016 Edition
Project Description:
Design and construction of 2No. car park extensions to the north and north east of the existing Albert Bartlett & Sons Ltd factory.
Works Included:
- Approximately 5,000m3 of clay / soil material was excavated and disposed at the rear of the Albert Bartlett factory to infill low areas
- Surface water drainage was installed down to 2.5m depths
- General road and footpath kerbs were installed throughout the site
- New road construction
- Street lighting and ducting
- Road markings