Client: Highland Spring Ltd
Value: £4.6m
Contract: NEC 3 Option A
Project Description:
Design and build of a new Rail freight depot hardstanding for Highland Spring
Works Included:
Site clearance;
- The removal of asbestos containing materials (ACMs) from the existing derelict building and demolition of the building
- Channel re-sectioning of the adjacent Allan Water
- Earthworks for the site, including ground improvement works
- Construction of acoustic barrier fencing running along the southern boundary of the site
- Construction of a two-way access road, including waiting areas and turning circles
- Construction of mass concrete running slabs to facilitate movement of gantry crane, including piled foundations and pile cap to be contractor design element
- Construction of a lay-down area adjacent to the proposed sidings
- Construction of a concrete slab to locate a prefabricated office and welfare unit
- Application of Hardipave (grouted macadam) throughout all blacktop surface areas
- Access junction and associated footway/drainage works for connection to the existing B8081 road which runs through Blackford town
- Drainage works including diversion of a small diameter foul sewer rising main
- Installation of all electrical and telecoms infrastructure required for the operation of the site, including a 11kV transformer