Client: Kilsyth Ltd
Value: £1.02m
Contract: ICE Minor Works
Project Description:
Construction of a 500kw run of river small scale hydro with 2 intakes and approximately 3.5km of buried pipework through agricultural land within the Loch Lomond and Trossachs National Park
Works Included:
- Construction of 1.5km of 3.5m wide floating roads consisting of 300mm deep layered system of geotextile membrane and 6F2 mixed with local recycled stone
- Widening and upgrade of existing access road
- Excavation of pipe track and reinstatement
- Installation of pipe work:
- 1.7km 600mm Diameter GRP
- 1.3km 630mm Diameter HPPE
- 500m 280mm Diameter HPPE
- 2 reinforced concrete intakes
- Reinforced concrete thrust blocks, transition and junction blocks to accommodate the change of pipe diameters
- Steel framed power house building (9m x 8m) blockwork walls with rendered finish and slate roof
- 40 tonne capacity steel bridge
- Reinstatement of traditional dry stone dyke
< Back to projects