Client: SP Energy Networks
Value: £1.6m
Contract: NEC 3 Option B with amendments
Project Description:
Construction of a steel framed building to house a new 132kV GIS switchboard and associated protection and control equipment
Works Included:
- Excavation to formation
- Installation of earthing
- Pad and strip foundations
- 350mm slab to main hall and 250mm slab to battery room
- External ducting and drainage
- Upfill to platform
- Perimeter slab and kerbing
- Superstructure works consisting of structural steel frame including all hot and cold rolled steelwork and cladding rails
- Earthing and bonding to steel structure
- Metal deck construction consisting of multi deck sheeting
- Construction of external staircases and platforms
- Main internal dividing wall constructed from blockwork
- Overhead crane installation on first floor
- Internal blockwork and linings painted
- Vinyl flooring to staff areas