Client: The Peoples Development Trust
Value: £3.2m
Contract: SBCC Design and Build
Project Description:
Design and build of a 2 storey community centre incorporating nursery, doctors surgery, pharmacy, dentist, shops, function hall and café
Works Included:
- 1700m³ cut and fill
- Pre-cast concrete piles supporting reinforced concrete foundations
- 171m³ reinforced concrete ground floor slab
- Gabion retaining wall
- Erection of steel portal frame
- Trimo wall cladding
- Membrane roof
- Reinforced concrete suspended flooring on Corus Comflor metal decking
- Pre-cast concrete stairs
- Installation of 13 passenger lift
- Brick and block work
- Drainage
- Installation of district heating system to tie into Commonwealth Games Athletes village network.
- Nike play surfacing
- Structural glazing to shop fronts and glazed canopies
- Solar shading
- Internal fit out including industrial kitchen in café
- Metal Stud and plasterboard partitions
- Moveable internal walls