Dersalloch Windfarm Control Building

Client: Iberdrola Engineering and Construction

Value: £989k

Project Description:

Construction of 600m2 steel framed 33kV/400V windfarm control building with meeting rooms, switchgear room, offices and toilets

Works Included:

  • Installation of reinforced concrete pad foundations
  • Bulk excavation for basement
  • Cast  in –situ concrete retaining walls  (2.7m high)
  • Reinforced concrete floor slab
  • Erection of steel portal frame
  • Composite steel profiled sheeting to roof
  • Internal fairfaced blockwork partition walls
  • External blockwork wall with rendered finish
  • Full M&E fit out
  • Installation of Stormsaver rainwater harvesting unit
  • Fit out to offices and toilets
  • 1 Hr FD 60/60 fire doors fitted throughout
  • Trenching and ducting for LV/HV power cabling and telecoms links
  • External drainage system including Conder ASP 12 waste  treatment plant
  • Installation of 20,000 litre underground  fire fighting water storage tank
  • Connection to  borehole water supply
  • Concrete hardstandings and footpath