Client: Ineos
Value: £2.2m
Contract: Ineos bespoke conditions of contract
Project Description:
Design, fabrication and erection of the structural steel support work for the 5km of refrigerated ethane pipeline
Works Included:
- Preparation of design calculations, drawings and fabrication lists for approval by the client
- Fabrication and erection of large lattice bridges approx. 25 – 40m single span
- Fabrication and erection of support legs and frames
- Access platform installation
- Goal post supports to expansion loops
- Handrails and stairs