Client: Atkins
Value: £450k
Contract: CECA Sub Contract 1998 for use with ICE Design & Construct with Atkins Rail Amendments
Project Description:
The project generally comprises of upgrading existing level crossing to AOCL+B standards (Automatic Open Crossing Locally monitored with Barriers) at the following locations:
- Garve Level Crossing
- Nigg Level Crossing
- Duirinish Level Crossing
- Bilbster Level Crossing
Works Included:
- Barrier arm bases
- Road traffic light bases
- REB bases
- Signal post telephone bases
- Signaling cabinet bases and plinths
- Pedestrian access routes
- Vehicle and pedestrian access gates
- Lineside troughing works
- Timber fencing
- Metal palisade fencing
- Road cattle grids
- Under road crossing and cable ducting works
- Installing anti-tresspass guards
- Installation of new strail units
- Kerbing and build-up of new carriageway
- Resurfacing works
- Road lining
< Back to projects