Client: Iberdrola Engineering and Construction
Value: £1.1m
Contract: NEC 3
Project Description:
Construction of Harehill Wind Farm control building and associated civil works
Works Included:
- Three stage basement constructed from in-situ concrete along with pad and strip foundations
- Erection of 30m x 13m steel frame
- Blockwork external and internal walls
- 100mm composite roofing panels
- Rendered finish to external walls
- UPVC windows, steel doors and roller shutter door to workshop
- Formation of attic area with timber joists and chipboard flooring
- Installation of earthing grid
- Trenching and ducting for LV/HV power cabling and telecoms links
- New perimeter fencing and gates
- Installation of foul and surface water drains, ducting, fire fighting water storage tank and waste treatment plant