Client: Centrica
Value: £78k
Contract: Centrica Standard Conditions
Project Description:
Construction of substation and installation of Electric Vehicle fast charging station
Works Included:
• Site strip
• Bulk excavation
• Capping with type 1
• Installation of new linear drainage
• Kerbing
• Surfacing and white lining
• Precast concrete base units for charging points
• Protective bollards
• Cable ducting
• Installation of perimeter fencing
• Landscaping
A Vehicle Marshalling system was used on site to ensure safe vehicle movements due to the busy Starbucks adjacent to the site.