Kypemuir Civil Engineering Works

Client: SP Energy Networks

Value: £321k

Contract: NEC 3

Project Description:

A 55.5MW wind farm is currently being developed by Banks Renewables, with location at map reference 285925,626663, for which a grid connection is required. To facilitate the grid connection a new 33kV/132kV SP-T substation will be constructed adjacent to the developers 33kV substation, from which a 132kV underground cable feeder will connect to the main and reserve busbar of Coalburn 132kV substation.

Coalburn substation is a 400kV/132kV configuration which has provision for 4 additional feeders, one of which will be the 132kV cable connection to the proposed SPT Middlemuir substation.

Works Included:

  • Installation of reinforced concrete foundations
  • Cable ducting including connection into existing GRP troughing
  • New below ground earthing
  • Connections to existing and reinstatement of all working areas