Longstone Bus Garage

Client: Lothian Buses

Value: £6.1m

Contract: SBC Q Scot 2005 Edition Revision October 2009 Incorporating Amendments SBCC Terrorism Update Issued August 2010

Project Description:

Construction of new engineering and maintenance workshop for Lothian Buses

Works Included:

  • Demolition of existing building and removal of asbestos roof sheets
  • Reduced levels digs and removal of material
  • Removal of contaminated ground where there was high levels of hydrocarbons
  • Piling platform for vibro compaction
  • Reinforced concrete pad foundations and strip foundations
  • 70m x 75m structural steel portal frame
  • Roof and wall cladding including membrane roof
  • Brick and block walls
  • Bus chassis  wash
  • Fuelling stations
  • 52m long Mot test and maintenance pits
  • 15m maintenance pits 
  • 2 fuel tanks 12 x 3.5 x 3.5 with a 126,000l capacity
  • Stud partitioning
  • Mechanical and electrical fit out including ventilation
  • Pre-cast concrete stairs
  • Metal fire escape and stair balustrade
  • IPS toilet panel systems
  • Installation of under floor heating
  • Wet rooms
  • Metal decking for upper office
  • Fit out and decoration of office area
  • Insulated overhead doors
  • Drainage including storm cell attenuation and filter trenches
  • Surfacing
  • Installation of platform lift
  • New water main, gas main and substation for power
  • Construction of timber crib acoustic wall