Client: Tennents Caledonian Breweries Ltd
Value: £398k
Contract: SBCC Minor Works with quantities
Project Description:
Shell works within existing packaging hall to enable new plant and machinery fit out
Works Included:
- Take down and remove existing personnel doors and roller shutter doors
- Blockwork wall to fill void from roller shutter door
- Application of new resin finish to the existing floor
- Internal and external metal cladding works
- Saw cutting to form 3m x 5m opening in existing 200mm thick concrete ceiling/floor 7m high to enable fitting of new carousel between the 2 floors
- Excavation to form four new lift pits
- Installation of new high speed roller shutter doors and fire doors
- Mechanical and electrical works including laser smoke detection system
- Painting the existing walls and ceilings