Client: Forth Ports Ltd
Value: £8.6m
Contract: NEC 3 Option A
Project Description:
Design and build of a 200,000ft² warehouse and associated infrastructure
Works Included:
- Formation of pile mat
- 158no 250mm² concrete friction piles and 486no 300mm² concrete friction piles
- Ring beam foundations
- Erection of 700t of structural steelwork and reinforced concrete floor slab 18170m²
- Single skin clad roof and walls
- Perimeter precast concrete push walls and internal precast concrete rocket walls and escape tunnels
- Mechanical and electrical works including power, lighting, fire main and fire alarm system and pedestrian doors and vehicle access doors
- Concrete and asphalt access road and reinforced concrete hardstanding 11720m²
- Installation of storm surface and foul water drainage system
- Office facility
- Weighbridge, CCTV and security fencing and port infrastructure upgrade of power and IT