Client: Clyde Gateway
Value: £920k
Contract: NEC 4 Option A
Project Description:
The construction of a spine road, footways and associated services at Shawfield, Glasgow. The site is located in Shawfield and within land administered by both South Lanarkshire Council and Glasgow City Council.
Works Included:
- Removal of boundary fences, obstructions
- Construction of new road, footways and verges, approx. 250m
- Earthworks to desired levels to allow the construction of new road
- Break up of ground floor slabs, hard-standings, existing roads and other surfaces along the new road
- Stopping up/grubbing up existing road infrastructure
- Managing multi-utility disconnection/diversion works
- SUDS features, land drainage packages and foul drainage works
- Traffic management to maintain use of Toryglen Street and Queensferry Street for vehicle and pedestrian access to existing premises
- Construction to adoptable standard of roads and footpaths including excavation and disposal, capping layer, sub-base and associated kerbing
- Surface water drainage, street lighting and BT ducting installation
< Back to projects