Value: £2.2m
Contract: NEC 3 Option A
Project Description:
Road construction/reconfiguration of existing roads to facilitate access to Griffin Wind Farm.
Works Included:
- Site clearance
- Road junction reconfigurations
- Traffic management – close liaison required with authorities to co-ordinate closures and diversions to minimise disruption to local users, whilst maintaining tight programme
- Public utility works – BT fibre optic cable re-location was challenging due to location
- 30,000m³ cut and fill of new carriageway route
- Retention of sloped areas by installation of over 500 soil nails 6m long and a combination of grout stabilisation, gabion baskets and reinforced concrete wing walls to the railway bridge
- Lowering of existing carriageway beneath existing railway bridge, incorporating permanent reinforced concrete structures and increased capacity drainage
- Protection of watercourse including pollution measures
- Removing Japanese knotweed
- Set up of compound in rural environment
- Liaison with Network rail including extensive form C temporary works design
- Liaison with local landowners and other stakeholders
- Close liaison with statutory bodies such as SEPA
- Liaison with local wind farm group to ensure good relations