Inchinnan Cycleway

Client: Renfrewshire Council

Value: £950k

Project Description:

Improvement to the existing Non-Motorised User (NMU) travel provision and provision of new footways/cycleways located along Greenock Road. The scheme length is 1.8km, commencing at Inchinnan Drive Roundabout, heading east, where it ties in with the Black Cart Cycle Bridge.

Works Included:

  • Widening out of the eastbound existing footway provision to form a series of shared and separated footways and cycleways.
  • Dropped crossings to lead cyclists into the new segregated cycleway.
  • Upgrades to the existing signalised crossing.
  • New traffic signals.
  • Repositioned kerb lines.
  • New diagonal cyclist crossing.