Client: Chivas
Value: £1m
Contract: SBCC with quantities
Project Description:
Upgrade of locker rooms and toilets within live bottling facility
Works Included:
- Creation of new access and installation of crash deck
- As the facing brick was now obsolete, the existing brickwork had to be carefully taken down and retained for later use
- Down takings and removals
- Existing suspended ceiling system
- Asbestos by specialist subcontractor
- Strip out old toilets and cubicles
- Careful phasing of services isolations required to minimise impact on other operational areas redundant services
- Coring through walls for service diversions
- Existing brickwork internal walls. A BROKK demolition robot was utilised for speed, noise reduction and to eliminate risk of HAVS often suffered by operatives using traditional hand held breakers
- Temporary dust cubes were installed for dust control during demolition
- Floors were ground down and levelled with new screed
Installations
- Aluminium windows
- Suspended ceiling system
- Upgraded services including lighting, ventilation, sprinkler system, fire alarm and CCTV
- Space saving solid laminate Z Lockers (Ph1 180no, Ph2 180no)
- Changing cubicles c/w benches 10
- Full height privacy cubicles were installed in both M/F toilets 17
- Disabled access toilet cubicles 2 c/w emergency alarm
- Disabled access shower rooms 2 c/w emergency alarm
- Shower room
- Wash hand basins c/w Dyson Airblade touchless taps and hand dryers
- Internal doors including fire doors
- Radiators
- Vinyl flooring
- Altro whiterock wall panels provide a hygienic wipe clean surface suitable for client’s future application of wall art
- Management of client’s term contractors for specialist testing and commissioning
Phase 3 refurbishment of entrance
- Curtain walling
- Glazed partitions
- Turnstiles
- Wall and floor coverings
- Lighting